Professional Comprehensive Building Materials Supplier
Product Introduction: Single-family Villa
- Categories:Our Houses
- Author:
- Origin:
- Time of issue:2020-07-15 10:32
- Views:
Summary description:The single-family Villa self-developed by BuildTech Corporation is a mid-to-high end product in the Steel structure mosaic green energy-saving building system, or BuildTech System (BTS).
Product Introduction: Single-family Villa
Summary description:The single-family Villa self-developed by BuildTech Corporation is a mid-to-high end product in the Steel structure mosaic green energy-saving building system, or BuildTech System (BTS).
- Categories:Our Houses
- Author:
- Origin:
- Time of issue:2020-07-15 10:32
- Views:
The single-family Villa self-developed by BuildTech Corporation is a mid-to-high end product in the Steel structure mosaic green energy-saving building system, or BuildTech System (BTS).
BTS system is a prefabricated building technology system formed by three-layer mosaic combined walls. It is mainly applicable to civil buildings with three floors and below, such as single houses or townhouses.
The features of BTS
1.Main structure: adopts steel structure; the unique sleeve assembly joint and full bolt connection increase the bearing capacity.
2.Maintenance system: outer walls mainly made of AAC grade A3.5B05, which are combined with an external thermal insulation decorative panel and an internal decorative panel.
3.Foundations: spiral pile foundation; prefabricated independent foundation; quick installation; no wet operation.
Model exterior renderings
Layouts
Functional zones and living space:
Lists of building materials (Basic Type)
Note: all of the above building materials are basic standard configuration, which can be changed, added or deleted. Buildtech can match the most cost-effective building materials according to the needs of customers.
Purchase Procedure
Step 1: Project Evaluation and Requirement
-Customers provide specific project requirements.
-Designers evaluate and produce design drawings.
Step 2: Provide Quotation
-Business people match building materials list.
-Provide quotations.
Step 3: Sign Contract
-Confirm drawings, bills of materials and quotations.
-Sign purchase contracts.
FAQs
Q: What's the material specification?
A: BuildTech system houses are mainly prefabbed by using Steel structures & AAC Panels. The other materials could offer according to the requirement of the clients. For more information, please visit our website: www.buildtechonline.com
Q: What's your terms of payment?
A: 40% advance payment(T/T) within 7 days after signing the contract, all materials will be prepared in 5-6 weeks upon the deposit. Rest of payment could be T/T or L/C.
Q: How can you send it to me?
A: All materials will be properly packed and to be loaded by container. We have got serial numbers of international professional shipping logistic partners to ensure your goods be delivered in time.
Q: How to assemble the houses on site?
A: All our materials are prefabricated parts, which have been designed and calculated in detail. Therefore, construction workers can easily learn how to install, we can also send our engineers to the site to guide the installation if necessary.
For further information or cooperation, please feel free to contact us.
Tel: 010-88082306; 010-88082336
E-mail: aliciachn@outlook.com; wudi19890922@163.com
CONTACT US
Tel | 86-010-88082316
Email | aliciachn@outlook.com
BuildTech Corporation
China Building Materials Building, No. 11
Sanlihe Road, Haidian
Message
Please leave us a message, we will be at your service.
BuildTech Corporation © All Rights Reserved