Professional Comprehensive Building Materials Supplier

搜索
Search
/
/
Product Introduction: 48m² Philippines Townhouse

Product Introduction: 48m² Philippines Townhouse

  • Categories:Our Houses
  • Author:
  • Origin:
  • Time of issue:2020-07-15 14:00
  • Views:

Summary description:The 48m² Philippines Townhouse self-developed by BuildTech Corporation is a low-to-mid end prefabricated townhouse product optimized for the Philippine customers.

Product Introduction: 48m² Philippines Townhouse

Summary description:The 48m² Philippines Townhouse self-developed by BuildTech Corporation is a low-to-mid end prefabricated townhouse product optimized for the Philippine customers.

  • Categories:Our Houses
  • Author:
  • Origin:
  • Time of issue:2020-07-15 14:00
  • Views:
Information

The 48m² Philippines Townhouse self-developed by BuildTech Corporation is a low-to-mid end prefabricated townhouse product optimized for the Philippine customers

 

 

Features of our prefabricated townhouse products

 

 1.Main structure: Q235 galvanized square tube steel structure system is adopted for beams and columns of main structure.

 2.Maintenance system: A3.5B05 grade AAC Panel is used for external wall of maintenance system.

 3.System-based Advantage:  A single house, with unified component specification, modularized design,  standardized connector, strong insulation and sound insulation, low cost and fast construction, will be completed in about 7 days with about 4-5 skilled workers.

 

Cross-section of the townhouse

 

 

Model renderings

 

 

For details, please click: → Panoramic display of 48㎡ Philippines Townhouses

 

 

Layouts

 

Lists of building materials (Basic Type)

 

Note: all of the above building materials are basic standard configuration, which can be changed, added or deleted. Buildtech can match the most cost-effective building materials according to the needs of customers.

 

 

Purchase Procedure

 

Step 1: Project Evaluation and Requirement
       -Customers provide specific project requirements.
       -Designers evaluate and produce design drawings.

 

Step 2: Provide Quotation
       -Business people match building materials list.
       -Provide quotations.

 

Step 3: Sign Contract
       -Confirm drawings, bills of materials and quotations.
       -Sign purchase contracts.
 

 

FAQs

 

Q: What's the material specification?

A: BuildTech system houses are mainly prefabbed by using Steel structures & AAC Panels. The other materials could offer according to the requirement of the clients. For more information, please visit our website: www.buildtechonline.com

 

Q: What's your terms of payment?

A: 40% advance payment(T/T) within 7 days after signing the contract, all materials will be prepared in 5-6 weeks upon the deposit. Rest of payment could be T/T or L/C.

 

Q: How can you send it to me?

A: All materials will be properly packed and to be loaded by container. We have got serial numbers of international professional shipping logistic partners to ensure your goods be delivered in time.

 

Q: How to assemble the houses on site?

A: All our materials are prefabricated parts, which have been designed and calculated in detail. Therefore, construction workers can easily learn how to install, we can also send our engineers to the site to guide the installation if necessary.
 

 

 

For further information or cooperation, please feel free to contact us.
Tel: 010-88082306; 010-88082336
E-mail: aliciachn@outlook.com; wudi19890922@163.com 

 

 

CONTACT US

Tel  |  86-010-88082316

Email   |  aliciachn@outlook.com 

 

 

BuildTech Corporation

China Building Materials Building, No. 11

Sanlihe Road, Haidian

Message

Please leave us a message, we will be at your service.

Username used for comment:
客户留言
Description:
这是描述信息
Customer service hotline
400000000 400000000
Service time:
8:00 - 24:00
Customer service group:
在线客服
WhatsApp:

BuildTech Corporation © All Rights Reserved